| Album: Sep 3, roof framing begins
Changed: Sep 03, 2010.
Contains: 5 items.
Viewed: 193 times.
|
| Album: Sep 1-2, main level exterior framing finished
Changed: Sep 10, 2010.
Contains: 5 items.
Viewed: 179 times.
|
| Album: Aug 31, north and south walls nearly completed
Changed: Aug 31, 2010.
Contains: 4 items.
Viewed: 182 times.
|
| | | | | | | |
|
|
| Album: Aug 30, floor joists, sub floor installed.
Changed: Aug 31, 2010.
Contains: 6 items.
Viewed: 192 times.
|
| Album: Aug 26-27, framing of basement knee walls, setting of main beam
Changed: Aug 28, 2010.
Contains: 12 items.
Viewed: 252 times.
|
| Album: Aug 24, crushed stone inside foundation, and back fill of soil
Changed: Aug 28, 2010.
Contains: 8 items.
Viewed: 198 times.
|
| | | | | | | |
|
|
| Album: Aug 20-21, foundation waterproofing applied, perimeter drain installed
Changed: Aug 28, 2010.
Contains: 5 items.
Viewed: 203 times.
|
| Album: Aug 19, foundation forms removed
Changed: Aug 19, 2010.
Contains: 3 items.
Viewed: 180 times.
|
| Album: Aug 18, forms installed, foundation poured
Changed: Aug 18, 2010.
Contains: 7 items.
Viewed: 232 times.
|
| | | |
|